# The part of the installation that leaves no margin for error

> Source: https://wchampion.pt/en/infraestrutura-electrica · updated 2026-10-09

Electrical Infrastructure

Networks, transformer substations and grid connection. This is the highest-risk part of our work, and therefore the one with the strictest rules on training, equipment and signage.

[Request a quote](https://wchampion.pt/contacto.html?servico=infraestrutura-electrica)[Projects](https://wchampion.pt/projectos.html)

Specific training

Medium-voltage work carried out by personnel with appropriate, documented training

Certified workwear

Arc flash protection to EN IEC 61482-2 and EN ISO 11612

25 years

Warranty on panels

10 years

Warranty on inverters

22%

Minimum efficiency

60%

Max. climate control saving

The risk

## The discipline where a mistake allows no second attempt

Medium voltage has its own rules, distinct from those of low voltage: a different training regime, different protective equipment and different signage, all set out in law.

The team entering a transformer substation has specific training and wears certified arc-flash workwear, category III PPE.

Medium voltage with our own team

This part is not subcontracted. The people who build the transformer substation and run the tests are ours, and they are the ones who answer if something fails at commissioning.

What goes underground stops being visible

Cable, cable route and depth are photographed with a positional reference before the trench closes. After that, checking means digging.

The connection depends on third parties

This is the phase where schedules slip, because it does not depend on us alone. We report dates once confirmed, and name what is at risk while there is still time to react.

III PPE category

Electrical Infrastructure

## What is guaranteed in writing

### Specific training

Medium-voltage work carried out by personnel with appropriate, documented training.

### Certified workwear

Arc flash protection to EN IEC 61482-2 and EN ISO 11612.

25 years

warranty

### Standardised signage

Danger-of-death warning and restricted access, in accordance with the regulation in force.

22%

minimum efficiency

### Documented testing

Measurements and tests delivered as a report before commissioning.

Solutions

## Works at every point of the network

Solution 01

### Transformer substation

Installation, standard signage and testing before commissioning.

See detail →

Solution 02

### Buried network

Trenching, cabling and cable routes, photographed before backfilling.

See detail →

Solution 03

### Grid connection

Coordination with the network operator until the connection is live.

See detail →

In detail

## What sits behind each one

01

### Transformer substation

We work in medium voltage with our own team, without subcontracting. Installation, standard signage and testing are completed before commissioning, because afterwards there is no margin left to discover what was missed.

- Our own team qualified for medium-voltage work
- Standardised signage and lock-out procedures documented
- Testing completed before commissioning, not after

02

### Buried network

What goes underground can no longer be inspected. Cabling, cable routes and depths are therefore photographed before the trench is closed, and the layout is handed over as a drawing to whoever has to intervene later.

- Photographic record with positional reference before backfilling
- Depths and separations in accordance with the applicable standard to the network type
- Layout handed over as a drawing, still usable years later

03

### Grid connection

The connection depends on third parties, and it is where schedules usually slip. We handle the process with the network operator and report dates as they are confirmed, not as they are hoped for.

- Process handled with the network operator through to live connection
- Test documentation prepared for inspection
- Dates reported once confirmed, with anything at risk named

## From first contact to documented handover

01

Electrical design

Load, protection and routing calculations, with drawings and specifications.

02

Approval

Coordination with the network operator and with the energy authority where applicable.

03

Delivery

Trenching, cabling, switchboards and transformer substation, recorded by phase.

04

Testing

Earthing, insulation and continuity measurement, with signed report.

05

Commissioning

Connection, safety signage on doors and handover of documentation.

The calculation is written down before the first team reaches the site

Delivered works

## Installations that demonstrate our capability

Transformer substation: switchgear, busbars and cable trays

Cable trenches open to the connection point

Cables laid with spacing and a sand bed

Ground prepared ahead of the electrical installation

## Questions that deserve a direct answer

Do you work on medium voltage?

Yes, with specifically trained personnel and certified arc-flash protective workwear to EN IEC 61482-2.

Who is the operator of record?

Not always WChampion. On a turnkey project the owner of the installation becomes the operator, and the door sign says so.

What signage is mandatory on a transformer substation?

A danger-of-death warning on the door, the door locked, and access restricted to suitably trained personnel.

Do you handle grid connection?

Yes, in coordination with the network operator. The timescale for that connection depends on the operator, not on the works, and is indicated in the proposal.

Request a quote

## For projects that demand a proper standard.

Tell us what you need. We reply with a written technical proposal.

[Request a quote](https://wchampion.pt/contacto.html?servico=infraestrutura-electrica) [Talk to us](tel:+351263948197)
