# A company measured by what it leaves documented

> Source: https://wchampion.pt/en/sobre · updated 2026-10-09

About Us

WChampion delivers technical projects across four disciplines and several European markets, with a written process and documentation the client keeps.

[Request a quote](https://wchampion.pt/contacto.html)[Projects](https://wchampion.pt/projectos.html)

## What we do

Solar photovoltaic energy, industrial HVAC, construction and refurbishment, and electrical infrastructure. All four share one method: survey, written calculation, documented delivery and handover with testing.

## How we work

With our own teams and a named person responsible per site. We do not subcontract responsibility: whoever surveys the project sees it through, and the name appears on the contract and the site board.

## What the client keeps

Photographic record of the works, measurement records, test reports and written warranties. With these, the work can be verified months or years later.

## Where we operate

Portugal, Belgium, Germany and England. Technical regimes differ from country to country; the standard of delivery is the same.

The method

## How the work runs at every stage of the job

01

### How a project starts

No figure is issued before someone visits the site. What is there gets measured, what will be covered gets recorded, and what was found gets written down, including whatever was not foreseen and will weigh on the schedule. The quotation comes from that, not from a price list.

- Site survey before any figure is given
- What is found is written down, including what puts cost or schedule at risk
- Changes reported before they happen, not discovered on the invoice

02

### Who answers for the work

Whoever carries out the survey stays with the project through to handover. The name appears on the contract and on the site board, and that is the person the client calls when something changes, rather than a general number where the answer depends on who picks up.

- One named lead per project, from survey to handover
- Direct contact with someone who knows the process
- Our own teams on the critical trades, medium voltage included

03

### Working outside Portugal

In Belgium, Germany and England, the applicable standard and the documentation required on site are those of the country, and inspection is local. So preparation is done before the team leaves: solving it on arrival costs weeks.

- Standards and documentation checked for the country where the work happens
- Materials chosen for the conformity required at destination, not at origin
- Records kept in the form the local inspectorate requires

04

### What remains after we leave

Work done properly has to be verifiable months later, by someone who was not there on the day. That is the purpose of measurement records, test reports and photographs of what the finish will cover.

- Measurement records and test reports for the critical phases
- Photographic record of everything that gets covered and can no longer be inspected
- Routes and schematics handed over as drawings, usable years later

The last bolt tightened that day is checked before the team leaves

Company film

## What we do, in one minute

The same method written on this page, filmed on site: survey, documented delivery and handover with testing.

WChampion · Company film

0:00 / 0:00

25 years

warranty on panels

10 years

warranty on inverters

22%

minimum panel efficiency

60%

possible saving on climate control

Request a quote

## For projects that demand a proper standard.

Tell us what you need. We reply with a written technical proposal.

[Request a quote](https://wchampion.pt/contacto.html) [Talk to us](tel:+351263948197)
