Production building and warehouse
In a large volume the difficulty lies mainly in air distribution. Too much air in one place and too little in another costs money and solves nothing. The calculation starts from the thermal load measured on site, with the occupancy and the process that are actually there.
- Thermal load measured in the space, with doors, loading bays and process running
- Ducted distribution sized by zone, with independent control
- Airflow balancing verified and recorded at handover