Ground-mounted plant
Siting starts with the ground: boreholes to define the structure foundation, a topographic survey for row inclination, and a shading study across the year. Only then are the installed capacity and the medium-voltage route fixed.
- Fixed or tracker structure, chosen on real gain at the site rather than from a catalogue
- Transformer substation and medium-voltage connection carried out by our own team
- Continuity, insulation and I-V curve tests per string before commissioning