The structure is the part you cannot correct later. Concrete, steel and masonry follow execution control with material testing, and anything outside tolerance is redone before the next phase starts, not at the end, when the correction affects the whole job.
- Material tests with records, not with declarations
- Dimensional control at each phase, before the next one begins
- Measurement records that allow the work to be checked months later